Inside the Concordia app

Inside the App

This is the coach.

Five screens from the product. Short days, plain English, nothing you have to decode.

Four of these are real captures from the app; the readiness screen is drawn in the product’s own components. Not concept art.

01 · Today

One plan, one screen.

Your lift and your run live together, spaced on purpose and checked off as you go. The week strip shows the shape of your training at a glance.

Concordia Today screen: the week strip with lift, run, rest and combo days and today ringed and checked, above today's Lower Body A maintenance session with per-exercise targets and a coaching note. Week 2 of 12.
02 · Readiness

30 seconds of honesty.

Sleep, fatigue, soreness, stress: four sliders, once a day. That’s the whole check-in, and the whole integration list. Your answers feed the engine that nudges volume up on good weeks and pulls it back before fatigue becomes a hole.

Concordia readiness check-in result: an 87 of 100 score ring reading Good to go, above a plain-English What This Means Today card telling the athlete to train as planned because the body is absorbing the work. The daily Hooper-index check-in of sleep, fatigue, soreness and stress produces this score.
03 · Logging

Log it in seconds. Get flagged when it matters.

Sets, loads, done. A PR the moment you beat your best, and a note on how each lift sits with your running.

Concordia workout logging: a Barbell Bench Press set grid with reps, load and RPE per set, a PR badge on the set that beat a best, and a coaching note that upper-body work has minimal running interference.
04 · The Plan

A block that breathes.

A plan with a shape: a foundation block to build the base, then a peak-and-taper block that protects your legs for the miles that matter. And the schedule itself teaches, so you’ll know why each session sits where it does.

Concordia Full Plan screen: an Intro Week followed by named training blocks - Block 1 Foundation across weeks 1 to 5 building the base, and Block 2 Peak and Taper across weeks 6 to 12 protecting the legs for peak mileage - each week expandable.
05 · Trends

Progress you can read.

Strength up, easy pace down, readiness steady: both halves of you, on one chart. Same effort, faster legs.

Concordia Trends screen, seven weeks in: stat tiles for average readiness, easy pace change, and squat and bench estimated 1RM, above one chart plotting squat and bench e1RM against easy-run pace, all oriented so up means improving.
◆ No wearable required, ever

The engine runs on honesty, not hardware.

Everything above works from logged sessions and the daily check-in. Bring a watch if you like. It’s never load-bearing.

Request Beta Access